You don't have javascript enabled. Good luck with that.
Pencarian
 Progres Normalisasi Saluran Jl Musik Raya Capai 45 Persen

Channel Normalization at Jalan Musik Raya Reaches 45 Percent

A water channel, which is still being normalized on Jalan Musik Raya, RW 07, Pegangsaan Dua Urban Village, Kelapa Gading, North Jakarta has reached 45 percent. It is targeted to be completed in three weeks ahead.

Prior to repair, it was full of mud and unoptimal. I saw its sheetpiles also broken

Normalization is conducted up to 158 meters length. It includes repairing and widening of channel from 60 centimeters into 1 meter. 

Normalization Conducted on Jalan Danau Buyan Kecil's Channel

"Prior to repair, it was full of mud and unoptimal. I saw its sheetpiles also broken," he expressed, Monday (2/18).

It is also downstream of the micro channel in the residential area, RW 05. As a result, because of unoptimal channel, it triggers a puddle.

Despite the work is unfinished, water from the channel can already flow smoothly towards the Accordion connecting channel.

"After this work, hopefully it can overcome puddle in RW 05, Pegangsaan Dua," he hoped.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye680 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye507 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye481 personFakhrizal Fakhri
  5. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye475 personAnita Karyati